Tuesday, September 23, 2014

Moving along

Hi. Well, no pictures today because there were too many people working in the house to take pictures. Thats a good thing.

Drywall done, carpenters done (With some returning for minor things), painters mostly done, electrician there today, almost done. They set the generator tomorrow.Insulation in the attic to be tomorrow. Mainly waiting in the plumbers now to finish. Bathroom tile completed, cabinets in. Also waiting on countertops. Carpet next week. Getting close...

Thursday, August 28, 2014

Outside done, I think

The outside of the house is just about done, other than the work I have to do, to make the landscape look pretty.

Monday, August 25, 2014

House got stoned

ok, so the stone is now done on the house and the drywall is hung. The drywall inspection was this afternoon. Hope the mudders can start tomorrow. Also hope the siders will be back some time soon to finish the siding.




And now the drywallers have until Sept 3 to get the drywall done or else I will have to pay for another month of POD rental...Guess someone needs to work the holiday weekend.

My 110 day guarantee is up soon, Sept 15!

Tuesday, August 19, 2014

Some updates

Well, insulation done and inspected. Drywall started to be hung today. Furnace was put in on Monday. Water line ran Monday, too.
I put in insulation in the garage outside walls (Not included with the home), and around the upstairs bathrooms, laundry room and master bedroom, for sound reasons. The siders should finish by the end of the week. Not much new to see so no pictures today.

Saturday, August 9, 2014

Suprise Suprise

Wow, the plumbing got completed and inspected Thursday, early. I am happy.

The fireplace was installed Friday. Siding was about halfway done on Friday. The fireplace inspection should be Monday, followed by framing inspection, then insulation Tuesday and drywall delivery Wednesday, installation to follow. I hope siding finishes Monday, too.

So, here are some half sided pictures :)



Thursday, August 7, 2014

The word of the day, DELAY!!!

Well, since the last post, there were a few inspections. Rough electrical passed. Plumbing and heating did not. Still not passed. Waiting all week for the plumbers to come out to do what they need to do to make the inspector happy. The interior of the house has been at a stand-still for 2 weeks waiting for the plumber to spare a few hours to fix what he needs to in order for the plumbing to pass inspection. Then, the building inspector will do firestop inspection and rough framing inspection. Insulation has been put on hold until these inspections are done. The plumber said he could be there Monday... That will be 2 weeks since it initially failed inspection. I know the plumbing inspector has been back at least twice since then, too.
On the good side, the garage floor and porch were poured this week (Building inspector waiting to approve basement to be poured until framing inspection complete), and last Friday the sewer line was ran from the house to the road. Water line scheduled for Monday. Talked with DTE and waiting the invoice to run permanent electric. Once paid, 8 business days till permanent electric service, max. Siding is scheduled for tomorrow, Friday! We will see. Was scheduled for Wednesday, but got changed. No hurries. Less than 5 weeks till my 110 days are up, I'm expecting a check...
Since siding is scheduled, I assume the tyvec inspection was done and passed (But no sticker in the house I have seen. Stickers for everything else).
No pictures yet. Hopefully some once siding started / done.
For those reading and following who are thinking of building their home through Wayne Homes, I know I have had many problems and delays with building. More than normal. Just so you know, the framer was out Tuesday to fix a mistake and told me he has just about finished one home since mine and has moved on to the next home for Wayne Homes (Of course mine still not inspected, so not officially done with framing yet).

Thursday, July 31, 2014

Inspection day tomorrow

So tomorrow will be a big inspection day. No new pictures since all the work has been inside. The electrical rough passed inspection. Tomorrow will be a follow-up rough plumbing and rough HVAC inspection, firestop inspection, tyvec inspection, rough framing inspection, and water/sewer tap inspection. If all goes good, insulation will start Monday, hopefully insulation inspection after, then drywall by the end of the week. Siding and cement flatwork as soon as the subcontractors can get out, then after siding, stone.
I have the weekend to hang insulation in the garage and sound barrier in master bedroom and bathrooms. The fun is, I also have to work all weekend. On top of that, I have dirt to arrange and the fun begins of dealing with DTE for my electrical hook-up.

Tuesday, July 22, 2014

More work

So, rough HVAC (Heating and cooling) is done. The plumbers said they would be done today, and the electricians are working away, hopefully to be done tomorrow or Thursday. Just need the framing completed and we can move on to inspections, insulation and drywall. Sorry no pictures, but there is not much to see of plumbing and electrical work.

I got the cable lines, phone lines, and networking lines ran yesterday, so that is done.

Thursday, July 17, 2014

Comments requested

Hi. Feel free to comment on the pictures and status updates.

Sorry for the delay in updates. I had a LOT of dirt to move, and moved all of it. Was a lot of work, so not much extra time for anything else.

Well, the house how has a roof and shingles and there are windows in place. It was a different crew shingling the roof and a different crew from 84 Lumber who installed the windows. Waiting the framer to come back and finish. He still has to make fireplace wall, finish the HVAC wall, install outside doors, and install the porch posts. I think he also has to finish up the house wrap so we can get the "Tyvec" inspection.We had the electrical walk-through, lots of add-ons. Also the HVAC guys were there and we have rough heating done. So, here are some pictures from today (Note all the new dirt I moved :) Now to get the dumpster out of my way).


My toy for the week, when I can keep my Dad out of it. Oh, it's AIR CONDITIONED!!



And Carolyn standing in front of her sunroom, next to all the dirt we brought in. It was almost as tall as her!

One question, I guess I never caught it on the prints, but in this picture, you can see the window doesn't line up with the door. To change it, all the sunroom windows would need taken out, openings lowered about 4-5 inches and then re-installed.


So what do you all think? Please comment.

Monday, July 7, 2014

A few trusses up now

Hi everyone. Well, I have had a few emails and phone calls about my blog recently. Wayne Homes is now working to see what they can do to rectify the problems. I will keep you all up to date. I am happy there is some progress on trusses.


It is a start to a roof!! It's sunny now, but there are storm clouds moving all over the area. A few more trusses to go, and one truss up there to be moved. Also, the extra bath stall is gone and my new shower surround is here.

We have been trying to figure out a better option than the small bobcat to move all the dirt I have to be moved. Wow is it expensive to rent earth moving equipment, but even more expensive to pay someone to move the dirt!

Friday, July 4, 2014

Happy July 4!!!

So its the 4th of July. I had to do yard work, at the new place. We were able to buy fill dirt from our neighbor, we just had to move it. I rented a Bobcat, and moved as much of it as I could. Maybe a third of the way done. I see more time on a bobcat in my future. I will have to get the pictures that were taken to post. (Rant on) I did not take any pictures because, honestly, Carolyn and I are getting upset about the lack of progress with our house. We are very disappointed with the framing crew (Or framing person). It has been a week since he has needed a crane to put up the trusses. The trusses still sit on the ground. The amount of work done by this crew in the last week is about the same as what I could do by myself in less than a day!

I have had 2 other people stop by while I was working on the lot who are also having homes built by Wayne Homes in Monroe County, MI. They are also getting fed up with the delays and excuses.I foresee 3 families getting the 110 day guarantee money paid to them.

My cabinets are in. I was scheduled to have them delivered Monday and stored in our garage, after the garage floor is poured and everything done, including drywall. Ha, I don't even have a roof yet. So, I had to rent a POD to store them in, not happy.

To top this off, Wednesday I went to the house and saw the showers have been delivered. To my surprise, I notice two tub surrounds in my garage. The funny thing is, our home has one tub and one shower stall. I call my field rep and leave him a message, but I already knew he was out of town and was told to call his supervisor. After calling the Wayne Homes office to get his phone number, I call him, no answer so I left him a voice mail. That was Wednesday. Today is Friday. Still got 2 shower stalls in my garage, and not a single return phone call.

Well, that's about it for this update, or lack of an update. I think if the trusses are still not up by next weekend I will call my friends, we will put them up, and bill Wayne Homes. (Ok, Rant off now).

Monday, June 23, 2014

Building the second floor

So they are now working on the second floor, on the third week of construction. Only lost a couple days due to weather. Eventually the house will be complete!!




Thursday, June 19, 2014

May the framing begin, Finally

June 11, 2014  The framing begins. So the cement had a little more than a week to cure. That makes it stronger, right? Well, the delay was not for curing but the framers or framer was "delayed a little bit" again. Seems to be a theme. There was one framer and his son (First season framing homes, second home) for the first few days. So far, there has been a maximum of 4 guys on the job at any given time. Very small crew. They said it is hard to find good help any more. Slow progress is better than no progress.








And that catches me up to a couple days ago. Since then, they have put the deck on for the second floor and built one wall for upstairs, but not stood it up yet so not much more to show in pictures. As soon as that is done, I will have  more pictures.
The framer said last week he hoped to put up trusses Tuesday of this week. This week he said he hopes to be done framing by the weekend and shingles next week. Now it's almost the end of the week and there is still a weeks worth of work to go...

Foundation work

May 27, 2014  They poured the basement walls, finally. They were "behind schedule a little bit".


May 29, 2014 they insulated the basement walls and then added more stone and backfilled.





Yes we are going to need a lot of fill dirt!!

Now for the waiting. The concrete must cure for 1 week minimum before they can begin framing...

Start building with a hole in the ground

May 5, 2014 was DIG DAY!!


Now we have a hole in the ground

May 9, 2014 they poured the footers
Yes, the house location sits low and will require LOTS of fill dirt. There was not much of a hole to be dug. Over the next week, they put stone in around the footers

Starting out and catching up

This is my first post for this blog. I am a little delayed in getting this started, so it will be a long post with a lot of catching up. I am Shawn and my wife, Carolyn wanted a new home. This is how it starts:
Feb 6, 2014 was our first visit to Wayne Homes in Bowling Green. We toured the models and was given a packet of available plans and our local price.
A week later, we had a follow up visit to iron out more details and options.
Feb 18, 2014 we paid our deposit and selected the Jamestown plan. After a few changes, we went with the traditional but added the full length front porch. We had selected the family elevation due to the porch, but found adding just the porch was cheaper, and we didn't care about the other design changes.
Feb 27 was our colors meeting. Things got expensive here, but luckily we were able to keep costs within reason.
March 17, 2014 we purchased the land we wanted and closed.
March 19, 2014 was the lot inspection. Carolyn was not feeling good, so we had to reschedule the pre-construction meeting in the office. Good thing, as you will see.
April 2, 2014 was the pre-construction meeting. To help control costs, we decided that I am going to do the phone and cable wiring, install the hard wood flooring and tile flooring, and we will take care of the counter tops and carpet ourselves, and get our own cabinets. The flooring was an all or none. We did not like the carpet options and tile options. We are not really saving money, but we are getting what we want. Real hard wood in the foyer, dining room, kitchen and mud room. Carpet in the living and family rooms, and everything upstairs. Upstairs bathrooms are getting porcelain tile. The counter tops I am doing is because I could save a lot of money over Wayne Homes price for the same solid surface counter top. As for the cabinets, I was fine with Wayne Homes cabinets except Carolyn was not happy with the wood / color options. All she wanted was a medium oak, no luck.
We also made some changes to the plans. We added a 3 ft by 6 ft closet to the loft area and moved the washer and dryer up there. We added a half bathroom where the washer and dryer was and got rid of the half bath in the middle of the house (Made it a closet in the living room). We also added a pantry closet, added a cabinet, and moved the refrigerator to the empty wall between the kitchen and garage, and took off the door to the mud room, and slid it down some. It added a lot more to the kitchen cabinets. The big change was we added a sun room at the pre-construction meeting!!
April 29 we closed on our construction loan. Have you ever dealt with a mortgage company, they are a pain in the butt...  Now the fun begins.