Thursday, July 31, 2014

Inspection day tomorrow

So tomorrow will be a big inspection day. No new pictures since all the work has been inside. The electrical rough passed inspection. Tomorrow will be a follow-up rough plumbing and rough HVAC inspection, firestop inspection, tyvec inspection, rough framing inspection, and water/sewer tap inspection. If all goes good, insulation will start Monday, hopefully insulation inspection after, then drywall by the end of the week. Siding and cement flatwork as soon as the subcontractors can get out, then after siding, stone.
I have the weekend to hang insulation in the garage and sound barrier in master bedroom and bathrooms. The fun is, I also have to work all weekend. On top of that, I have dirt to arrange and the fun begins of dealing with DTE for my electrical hook-up.

No comments:

Post a Comment